Full Record

Main Title: South Eastern Freeway, Malvern section : cut and cover tunnel study : comparison of advantages and disadvantages of the intermittent tunnel concept with both the continuous tunnel concept and the C3 surface freeway concept : comments / prepared by the Country Roads Board.
Author: Victoria. Country Roads Board
Imprint: [Kew, Vic. : Country Roads Board, 1982.
Collation: 11 p., 4 leaves (3 folded) : ill., maps pbk ; 30 cm.
Subject: Tunnels
Roads, streets etc
Freeways
Transport
Town and urban planning
Reports
Result Collection Location Shelf No Status Notes
Non-Fiction Stacks 388.1 SOU Available